top of page


OUR PROJECTS
Search


YVCC- Raymond Hall Renovation
The project consisted of renovations to the existing 27,000 sf two-story building and a 9,500 sf front entry and quiet study addition....


East Valley High School Addition and Modifications
We constructed a 2-story classroom addition, re-roofed the entire High School building, and placed all new sidewalks at the building’s...


Astoria Medical Clinic- Tenant Improvements
There are presently 11 medical providers located within the facility. The suites vary in sizes from 2,000 SF to 5,000 SF. These medical...


Yakima Fire Station #92 Facility Addition
The project consisted of adding a new living area to an existing volunteer fire station, in order to make it a fulltime fire station. A...


Wild Horse Wind Farm Maintenance Facility
This project consisted of constructing a new 15,000sf pre-engineered metal building and associated site work, including concrete walks....


Allan Bros, Apple Pre-Size Packing Plant
The basic building system was a pre-engineered metal building with 6’ high wainscot tilt-up sandwich panels and 2 ½” pre-finished metal...


Astoria Medical Clinic Building Addition
The Astoria Medical Clinic is the premiere privately owned medical facility in the growing city of Astoria, OR. The new addition will...


Wapato High School Library Addition and Middle School Classroom Addition
We were the successful bidder on both these public works projects in the summer and fall of 2005. The Library addition project bid first,...


LEKTRO Building Expansion
This project was for the remodel and expansion of a WWII vintage airplane hanger at the Astoria Airport. An existing warehouse office...
bottom of page