YVCC Sherar Gym Acoustical & Misc Improvements

YVCC Sherar Gym

The majority of construction was completed from the 23 foot mark and above. The construction consisted of laying down 3 layers of floor protection across the entire gym floor, demolition of existing acoustical system, light fixtures, and miscellaneous materials from walls, beams, and ceiling, painting the entire ceiling including beams and one bay wall, electrical including hanging new light fixtures, installing new acoustical baffles, and installing an equipment suspension system from which a speaker system and spot lights were installed.
OWNER:
Yakima Valley Community College

LOCATION:
Yakima, WA

TOTAL SIZE OF PROJECT:
12,720 sf of floor protection plus 352 acoustical baffles and more

YVCC Sherar Gym

DURATION OF PROJECT:
1 month

PROJECT TYPE:
Schools