East Valley High School Addition and Modifications

East Valley High School

Two story classroom addition to existing high school
We constructed a two story classroom addition, re-roofed the entire high school building, and placed all new sidewalks at the building's entry. The addition was stucco finish over CMU with a pre-cast 2nd floor structure and a wood framed roof structure. The schedule was tight, but we completed the project a few days early to allow the school district to move into the new facility.
East Valley High School
2nd floor slab structure was pre-cast planks
OWNER:
East Valley School District, No.90


LOCATION:
Yakima, WA


TOTAL SIZE OF PROJECT:
9,800 sf


DURATION OF PROJECT:
4 ½ months