Concord Construction, Inc.  
Projects >> FOOD INDUSTRY >>
Olympic Fruit Packing Building Expansion

Olympic Fruit Packing Building Expansion
New addition framing spanned 120 ft.
A 120ft x 120ft addition was added onto an existing packing room. The new construction was a pre-engineered metal building with no interior columns. The exterior walls consisted of full height exposed aggregate tilt-up panels to match existing. A metal framed machine room was also built to accommodate increased refrigeration loads.
Olympic Fruit Packing Building Expansion
WF embedded in slab as runners for automated pallet stacker
OWNER:
Olympic Fruit


LOCATION:
Moxee, WA


TOTAL SIZE OF PROJECT:
15,000 sf new, plus retrofit work


DURATION OF PROJECT:
4 months


PROJECT TYPE:
Agricultural Building (Packing)
A critical piece of this project was embedding side by side wide flange beams in the floor slab to accommodate an automated pallet stacker. The flatness tolerance for the beams was +/-.001 over the entire length of the beam.