Concord Construction, Inc.  
Projects >> FOOD INDUSTRY >>
Cold Storage Loading Dock

Cold Storage Loading Dock

Refrigerated Dock Building
The construction consisted of a pre-engineered metal building with 2 1/2" pre-finished insulated wall panels, and 3" insulated roof panels. The floors were 6" slab-on-grade. The project included 8 dock positions with provisions to add 4 more in the future.
LOCATION:
Naches, WA

TOTAL SIZE OF PROJECT:
15,282 sf

Cold Storage Loading Dock

During construction
DURATION OF PROJECT:
4 months

PROJECT TYPE:
Agriculture - cold Storage

Cold Storage Loading Dock

Building in use
Concord Construction, Inc. performed all the preliminary study and planning services including budget costs, layouts, environmental studies, and permit requirements. Concord also produced the architectural documents and coordinated the basic structural engineering work that was required. We worked closely with Yakima County to obtain phased permitting to allow construction to begin sooner.